Hepiyanto, “Optimalisasi Waktu dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM),†J. With the results, it can be used as a reference in the implementation of project activities.ī. From these results it can be seen that the CPI value < 1 which means that there are project expenditures that exceed the original plan. As well as project analysis of acceleration on a critical trajectory of work. From these parameters, estimate aspects of cost and time. Calculations include the calculation of ACWP (Actual Cost of Work Performance), BCWS (Budgeted Cost Work Schedule), and BCWP (Budgeted Cost for Work Performed) using the Earned Value method. This research aims to optimize the cost and time on the project using the Earned Value method. The project was carried out with the aim that access to (Surabaya-Mojokerto) or further trans Java toll road is quicker safe and smoother. Jombang-ploso-legundi-gresik road project is one of the road widening projects carried out by PT. Cost and time are aspects that need to be considered to avoid losses incurred in a project. Faculty Of Engineering, Kadiri UniversityĮarned Value, Project Delay, Project Management, Road Construction Abstract In a construction project, there are several aspects that cause the project not to go according to plan.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |